Steel Pate Turret Punching Machine with Factory Price

Product Details
Customization: Available
Type: High-Speed Punching Machine
Punch Shape: Closed Punch
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
103
Year of Establishment
2007-04-28
  • Steel Pate Turret Punching Machine with Factory Price
  • Steel Pate Turret Punching Machine with Factory Price
  • Steel Pate Turret Punching Machine with Factory Price
  • Steel Pate Turret Punching Machine with Factory Price
  • Steel Pate Turret Punching Machine with Factory Price
  • Steel Pate Turret Punching Machine with Factory Price
Find Similar Products

Basic Info.

Model NO.
AMD 357
Slider Movement
Triple Action
Slider Drive Mechanism
Crank Press
Controlling Mode
CNC
Automatic Grade
Automatic
Power Source
Mechanical Drive
Precision
High Precision
Certification
CE, ISO 9001
Condition
New
Transport Package
in Container
Specification
4490*5300*2110
Trademark
amada
Origin
China
HS Code
84621010
Production Capacity
20 Sets/Month

Product Description

Steel pate turret punching machine with factory price
Steel Pate Turret Punching Machine with Factory Price
Steel Pate Turret Punching Machine with Factory Price

Technical Parameters:
Specification Unit AMD-357
Transmission mode / Mechanical
Punch force KN 250/300
Power rating KW 11
Processing sheet size mm 2500*1250
Processing sheet thickness mm ≤4
Max. Punch diameter mm Ø88.9
Sheet moving speed m/min 40
Punching frequency hpm 300
Hole accuracy mm ±0.1
Number of stations in turret No. 16/24/32
Turret speed rpm 30
Controlled axis No. 3/4
Rotating location No. 0/2
Air pressure Mpa ≥0.8
Outline Dimension mm 4490*5300*2110
Machine Weight T 11

Steel Pate Turret Punching Machine with Factory Price
Steel Pate Turret Punching Machine with Factory Price
Company Information:
Steel Pate Turret Punching Machine with Factory Price

FAQ:

1. Production time:

20-30 days according to different type.

2. Installation and commissioning time:

7-10 days.

3. Installation and commissioning issue:

We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Payment term:

30% as prepayment, balance 70% before delivery or L/C at sight.
5. We supply full english documents:

including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.

Contact Information:


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier