Customization: | Available |
---|---|
Certification: | CE, ISO |
Installation Method: |
Customize |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Feature:
1. The dust air inlet shall be equipped with dust plate to prevent the dust from directly impacting the filter cylinder, thus extending the service life of the filter cartridge.
2. Compact structure and small footprint.
3. The filter cylinder is inclined and drawer installed, which can make the cartridge to be removed and replaced more conveniently.
4. For the general dust, the filter cartridge can be used for a long time without replacement, which saves the tedious work of the commonly used bag filter, and saves a lot of maintenance costs.
5. The filter cartridge is a modular combination, and its size is optional.The original combination can be expanded to increase the dust removal unit without much modification to the original equipment.
Qingdao PUHUA has several dust collection systems that can be adapted to any manufacturer's blast equipment and will effectively and efficiently evacuate dust and debris resulting from the blasting process. These easily maintained, all inclusive systems require little maintenance and typically only require routine cartridge changes. Additionally, we offer dust cartridges to keep customers dust collectors working at peak efficiency.
The condition of the dust collector is critical to proper performance of the separator.
PARAMETER | Removing dust air volume | Filtration(m2) | Induced draft fan rate(kw) |
HR-4 | 3000 | 80 | 5.5 |
HR-8 | 6000 | 120 | 7.5 |
HR-12 | 9000 | 180 | 11 |
HR-16 | 12000 | 240 | 22 |
HR-24 | 18000 | 360 | 22 |
HR-32 | 24000 | 480 | 30 |
HR-36 | 27000 | 540 | 37 |
HR-40 | 30000 | 600 | 37 |
HR-48 | 38000 | 720 | 37 |
HR-56 | 42000 | 840 | 45 |
HR-64 | 56000 | 860 | 45 |
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.