Customization: | Available |
---|---|
Application: | Hardware Spraying Equipment, Wood Spraying Equipment, Plastic Spraying Equipment, Porcelain Spraying Equipment |
Certification: | CE, ISO |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Advantage:
1.Direct factory with CE ISO certificate
2.infrared heat car painting baking room
3.baking painting performance
4.factory,competitive price.customize
6.pre-sales service & after sale service
Configuration:
1. Wallboard: Sandwich style EPS (epispastics polystyrene) 50mm thickness. Galvanized steel roof panel.
2. Basement: Galvanized steel sheet and square steel pipe construction. 3 rows of grids with floor filter & 2 rows of checkered plates. 2 pcs of ramps.
3. Door: 3 pcs of front doors with aluminum frame Size: 3000(w) x 2600(h). 1 pc of emergency door.
4. Air Circulation System: 2pcs of environmental air blowers as intake fan at the top of roof, each is 1.5KW, 12500m3/h, total 25000 m3/h ,1pc of 4KW centrifugal fan as exhaust fan, 12500 m3/h,
5. Heating System: 10 groups of 3*30pcs luxury infrared carbon fiber heating lamps. The operating temperature 50ºC-75ºC, max temperature 80ºC.
6. Lighting System: Ceiling light has 24 pcs of 16w LED lamps. 1200 Lux.
7. Air Purification: Dual filtering structure. The primary filter can capture granules larger than 10μm. Ceiling filter capture granules bigger than 5μm. The air cleanliness in the working environment can reaches 98%.
8. Pollution Control System: Multi-layer fiberglass filter.
Model |
External Size (m) |
Internal Size (m) |
Air Flow (m3/h) |
Air Speed (m/s) |
Power (kw) |
Vehicle Suited |
WW0602A |
8x4x4.3 |
6.9x3.9x2.65 |
25000 |
0.3-0.5 |
38 |
Saloon Car Jeep |
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion.
3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.