Customization: | Available |
---|---|
Application: | Removing Rust |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
To clean and prepare surfaces before applying a coating / paint / resin / tiles
To remove old coatings, rubbers on airports
To remove marking on roads, highways, runways, industrial floors…
To regenerate grip and improve safety on roads
We offer you a large selection of equipment, ranging from handheld model PSB75 to
the PSB150 in either remotely controlled version or truck-mounted, plus 5 intermediate models, to cover all applications on any job site.
All our shot blasters are dust free, if connected to their respective dust collector.
Technical Parameters:
Model | PHLM240 | PHLM550 | PHLM600 | PHLM800 |
Total Power | 18kw | 29kw | 29kw | 38kw |
Effective cleaning width | 240mm | 550mm | 600mm | 800mm |
Productivity on concrete | 120m2/h | 300m2/h | 330m2/h | 450m2/h |
Blasting wheel quantity | One | Two | Two | Two |
Traveling speed | 0.5 - 23 m/min | 0.5 - 25 m/min | 0.5 - 25 m/min | 0.5 - 20 m/min |
Dust collecting type | Blowback cartridge filters |
Blowback cartridge filters |
Blowback cartridge filters |
Blowback cartridge filters |
Travel type | Horizontal, self propelled |
Horizontal, self propelled |
Horizontal, self propelled |
Horizontal, self propelled |
Overall dimension (mm) | 1600×432×1016 | 2050×720×1460 | 2050×720×1460 | 2150×980×1450 |
Weight | 335kg | 595kg | 630kg | 685kg |
Qingdao Puhua Heavy Industrial Machinery Co., Ltd. was founded in 2007. We focus on designing, researching and developing, manufacturing and selling shot blasting machine, CNC punching machine, sand preparation equipment, moulding core production equipment, and environmentally-friendly dedusting equipment.
We have more than 60 self-developed designs and molds for you to choose from. We release at least 10 new products monthly to meet the latest market trends. With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers.
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.
Contact Information: