Customization: | Available |
---|---|
Application: | Forging,Casting,Machinery. Metal |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The wire mesh belt shot blasting machines were developed according the market demand. The wire mesh belt structure ,steel shot when the road network with speed according to the frequency control of the artifact types,shot blasting will be more uniform,clean-up time will be greatly reduced efficiency.in addition,the workpiece will bot collide,it will not fall to also to deal with tin-walled afraid of collision of various parts mesh belt shot blasting machine to achieve the small and medium-sized continuous casting operations,delivery devices through both ends of the configuration can be achieved and line,fully automated operation,both to avoid the collision between the workpiece,but also greatly improve the efficiency of the clean-up.
The wire mesh belt shot blasting machines are used for mechanical parts shot blasting strengthen.it is mainly applied for automobile,aerospace,railway and other machine manufacture industry ,especially suitable for the surface of the thin-walled iron or aluminum castings and other small parts.
Mesh belt-type shot blasting machine is mainly used for thin-walled castings, thin-walled and fragile iron or aluminum alloy castings, ceramic and other small parts surface shot blasting.Mesh belt-type shot blasting machine can also be used for mechanical parts shot blasting and strengthen.
With a small continuity, high cleaning efficiency, deformation is small, no pit and other characteristics.
It can be used alone, also can use more than one combination.
Mainly used for steel structures, castings, aluminum parts and other parts of the surface cleaning and strengthening.
Widely used in casting, forging machinery, steel and other industries.
Parts details:
NAME |
MATERIAL |
Life |
blades |
High chromium Precision casting |
≥800h |
control cage,distributor |
High chromium Precision casting |
≥1000h |
protection plate |
High chromium |
≥1500h |
side plate |
High chromium |
≥2500h |
impeller |
40Crquenching |
≥2500h |
1. Production time:
20-30 days according to different type.
2. Installation and commissioning time:
7-10 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.