Customization: | Available |
---|---|
Application: | Steel Plate, Steel Strucutre, H Beam |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Purpose
This steel plate shot blasting machine is primarily for shot-blasting of steel plateto remove the rusty spot, rusty layer and scale cinder on steel to obtain a uniform, smooth and glossy metal surface allowing improved coating quality and higher anti-corrosion performance.
2.structure
In this roller-feeding type high-performance shot-blasting machine, the work-piece is fed to the blasting zone with a conveyer roller driven by a speed-regulating motor, and subject to striking and friction of dense shots blasted by the eight throwing wheels from various directions, resulting in the removal of scale cinders and dirt and a smooth surface with minor roughness. In addition, the dense striking on the workpiece will help to eliminate the stress on the workpiece and prevent it from distorting.
Parameter | Q698 | Q6812 | Q6915 | Q6920 | Q6925 | Q6930 | Q6940 |
The effective cleaning width (mm) | 800 | 1200 | 1500 | 2000 | 2500 | 3000 | 4000 |
Dimension of inlet opening (mm) | 1600*800 | 1200*400 | 1700*400 | 2200*400 | 2700*800 | 3200*800 | 4200*400 |
The length of cleaning workpiece (mm) |
1200- 12000 |
1200- 16000 |
1200- 12000 |
1200- 12000 |
3000- 12000 |
2400- 12000 |
4500- 18000 |
The speed of conveyor (m/min) | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 |
The thickness of cleaning steel sheet (mm) |
3-60 | 3-60 | 1.5-60 | 3-60 | 3-60 | 3-110 | 4.5-100 |
Shot ball flow rate (kg/min) | 4*120 | 4*250 | 4*250 | 6*250 | 6*250 | 6*360 | 8*360 |
The shot ball first loading (kg) | 4000 | 4000 | 4000 | 4500 | 4500 | 8000 | 11000 |
Roll brush adjusting height (mm) | 200 | 200 | 350 | 450 | 600 | 850 | 900 |
Air capacity (m3/h) | 22000 | 17560 | 19000 | 19550 | 27758 | 28050 | 38000 |
Total power (kw) | 90 | 78.3 | 113.5 | 156.6 | 204.8 | 224.55 | 293.6 |
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion.
3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.
Contact Information: