Customization: | Available |
---|---|
Certification: | CE, ISO |
Installation Method: |
Vertical |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Parameters:
Parameters |
MC200 |
MC250 |
MC300 |
MC350 |
MC400 |
|
Filtration area(m2) |
200 |
250 |
300 |
350 |
400 |
|
Disposal air quantity(m3/h) |
26400 |
33000 |
39600 |
46200 |
52800 |
|
Sieve bag specification |
Diameter |
130 |
130 |
130 |
130 |
130 |
Length |
2500 |
2500 |
2500 |
2500 |
2500 |
|
Sieving bag quantity |
200 |
250 |
300 |
350 |
400 |
|
Filtration wind speed |
1.2-2.0 |
|||||
Removing dust efficiency |
99.5% |
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.