Qxy2000 Steel Plate Pretreatment Line

Product Details
Customization: Available
After-sales Service: Video Instructiion
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
103
Year of Establishment
2007-04-28
  • Qxy2000 Steel Plate Pretreatment Line
  • Qxy2000 Steel Plate Pretreatment Line
  • Qxy2000 Steel Plate Pretreatment Line
  • Qxy2000 Steel Plate Pretreatment Line
  • Qxy2000 Steel Plate Pretreatment Line
Find Similar Products

Basic Info.

Model NO.
QXY2000
Application
Electronic Industry
Fuel
Electric
Type
Ring Rail Abrator
Cleanliness
High Cleanliness
Automation
Automatic
Certification
CE
Feature
Rust / Corrosion Proof
Condition
New
Customized
Customized
Transport Package
Wrapped Film and Wooden Case
Specification
whole production line length 55m
Trademark
puhua
Origin
China
HS Code
8424300000
Production Capacity
20sets/Year

Product Description

QXY2000 Steel plate pretreatment line
Qxy2000 Steel Plate Pretreatment Line
1.Roller system
Item Unit Parameter
Lateral moving roller table (2 sets) Transverse lifting capacity t 10
Trolley drive speed m/min 23.4
Jacking speed m/min 13.2
Length of traverse trolley body m 2.5
Number of traverse trolley set 6*2
Trolley drive motor power kw 5.5kw*2
Motor power of oil pump station kw 11kw*2
Conveying speed m/min 2.5-4
Loading and unloading roller table Transfer speed m/min 0.5~6
Roller diameter mm Φ120
Width of table mm 2000
Roller distance mm 400
Roller center height mm 1100
Chain specifications   12A
Conveying roller table of shot blasting room Transmission power KW 4
Wear-resistant roller sheath material   Cr20
Roller distance mm 600
Form of protection   Sheathed
 
  1. Application:
QXY2000 steel plate pretreament line is a specially designed machine used in the surface cleaning for various jobs. It can realize the shot blasting, painting/primer and drying automatically. It includes shot blasting system, painting/ primer and drying system.

2.Working principle:
The workpiece is transported to the feeding roller table by the hoisting tool, and then enters the shot blasting cleaning room. The cast steel shot or cut wire shot is accelerated to the surface of the workpiece by the high-speed rotating impeller of the shot blaster, and impacts the surface of the workpiece. , Scraping to remove the rust and dirt on the surface of the workpiece, and then use the roller brush, the collecting screw and the high-pressure blow pipe to clean the accumulated pellets and floating dust on the surface of the workpiece. The rust-removed steel directly enters the spray booth and is installed on the upper and lower spray paint carts. The upper spray gun sprays the workshop maintenance primer on the surface of the workpiece, and then enters the drying room to dry so that the paint film on the steel surface reaches the finger-dry state, and then is quickly sent out and then blanked. So that the steel can achieve the purpose of rust removal and rust prevention.
Qxy2000 Steel Plate Pretreatment Line
Qxy2000 Steel Plate Pretreatment Line

  1. Pre-heating chamber
Pre-heating chamber Item Unit Parameter
Propylene consumption (C3H6) m3/min 0.8-1
Length of chamber mm 6000
Heating temperature ºC 40-200
Working pressure of propylene Mbar                    15-20
Burner output heat kcal/h 500000
  Number of gas appliances pcs 4
  Lifting stroke of gas appliance mm 500
  Oil and water removal efficiency   100% (the accumulated water can also be removed in combination with the surface cleaning device)
  Motor power of exhaust fan   No power exhaust
  1. Shot blasting machine
Item Unit Parameter
Blasting wheel
Q034-3 Model
Shot blasting amount kg/min 4*270
Motor power KW 4*15kw
Working speed rpm 2930rpm
Shot blasting rate Kg/min 270kg/min
weight kg 200kg
outsize mm 700*240*500mm
Blade life h 3000
Control cage life h 12000
Distributor life h 12000
Impeller life h 30000
Life of the inner guard plate of the enclosure h 12000
Separator
Overflow sensing automatic regulating type
Separation amount t/h 60
Power KW 4
Speed m/s 4-5
Elevator Lifting amount t/h 60
Running time of belt h 10000
Motor power KW 5.5
Speed m/s 1.56
Belt life of elevator month 18 Polyester core
QTY set 1
Vertical screw Throughput t/h 60
Diameter of screw mm 300
Motor power KW 4
QTY pcs 1
Horizontal screw Throughput t/h 60
Dust removal system(Explosion-proof fan)
Dust removal system includes dust collector, fan and fan duct, connecting duct between dust collector and host.
The main fan power is 37 kw, the pulse back blows the ash, and the dust collector cartridge can be easily removed for cleaning and reuse.

Unique and effective dust removal structure:
The first-level dust removal is a projectile settling chamber designed on the top of the equipment. This settling chamber is an inertial settling chamber that conforms to the aerodynamic principle. It can achieve effective settling of the projectile without generating pressure loss. And we have designed a one-way valve in the lower part of the sedimentation chamber to prevent the formation of pneumatic conveyance, which can effectively achieve the pellet settlement. The purpose of this level of dust removal is to solve the problem of sand absorption and sand accumulation in pipelines.
Secondary dust removal is a proven and economical filter cartridge dust collector. The filter cartridge dust collector adopts the venturi pulse back-blow ash cleaning system of Venturi principle, which has the advantages of low filtering wind speed, high filtering accuracy and good ash cleaning effect.
Drying Chamber
The drying room adopts the principle of hot air circulation drying, and the heat exchanger is heated by gas (C3H6) to generate heat through heat exchange. In addition, the waste heat of the preheating system can be sent to the drying room through the pipeline. After the steel is dried in the drying room, the surface paint film can reach the dry (or dry) state.
The top and end of the chamber body adopts a double-layer box structure, lined with thermal insulation materials, which is conducive to the full utilization of heat and can be disassembled. The two side walls adopt the open-door structure, which is convenient for the maintenance of the plate chain system.
The conveying of workpieces in the drying chamber adopts a plate chain conveyor (please refer to the steel conveying system).
The heating heat source is set in the induced draft fan pipe in the upper part of the drying room, and the fan valve on the air duct can be adjusted to adjust the air volume. Using the electric contact temperature sensor, the indoor temperature can be automatically controlled at a certain temperature between 40-70 °C The indoor uniformity is 5°C, and the time for the temperature to rise to 60°C is less than 25 minutes. The temperature controller is placed on the side wall of the drying chamber, which can be easily observed and adjusted.
In order to prevent explosion, an exhaust device is provided in the drying system to reduce the concentration of organic solvents in the drying room. The exhausted air containing harmful gases is treated by the activated carbon adsorption system together with the air of harmful gases generated in the spray booth.
 