Customization: | Available |
---|---|
Application: | Petrochemical Engineering, Steel, District Heating |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Type | Cleaning size (mm) |
Cleaning speed (m/min) |
Purpose |
QGW100 | 50-300 | 2-10 | Outer wall of shot blasting machine |
QGW720 | 159-720 | 2-6 | |
QGW1200 | 219-1016 | 1-6 | |
QGW1500 | 325-1600 | 1-6 | |
QGW2800 | 1016-2800 | 1-2 | |
QGN100 | 50-300 | 1-4 | Inner wall of shot blasting machine |
QGN700 | 325-720 | 1-2 | |
QGN1000 | 720-1016 | 1-4 | |
QGN1500 | 1016-1500 | 1-4 |
1 | 20 years professional production experience in shot blasting machinery industry. |
2 | 40,000 m^2 production workshop, strong production capacity. |
3 | Professional senior engineer develop the best solution. |
4 | Strict quality control system, CE, BV, ISO9001 certificate available. |
5 | Main components adopt imported international famous brand. |
6 | Timely delivery, one hour to Qingdao port. |
7 | Professional after-sale service, Email will be reply in 24 hours. |
8 | Site installation and commissioning in your factory |
After-sale service | |
Installation and commissioning issue |
We will send one technician to assist with machine installation and commissioning, customer pays for return tickets, local hotel and diet. Customer should arrange skilled orkers and installation machinery and tools in advance. |
Warranty time | 12 months from date of commissioning completion, but no more than 18 months from date of delivery. |
Supply full English documents |
Including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc. |
Exported experience | Since 2009, over 90 countries, including The USA, Germany, Canada, Russia, UK, Australia, Malaysia, UAE, Egypt, Mexico, Brazil, etc. |
Material of wear parts | Cr20S High Chrome, ZGMn13, Mn65, etc. |
Trade Information | |
MOQ | 1set |
Settlement Currency | USD, RMB, EUR. |
Trade mode | FOB (FCA), CIP, CFR, CIF, DDU, DDP, Turnkey. |
Payment term | 30% deposit by T/T, the balance paid by T/T before delivery or L/C at sight, etc |
Delivery time | Within 20-60 days according to different type equipment. |