General Introduction:
1) Offer high efficiency with our air filter cartridges
2) Tool-free hole cap can be disassembled or replaced
3) Choose the proper air filter cartridge according to the property of dust.
Construction:
1) Material: Carbon steel or stainless steel
2) Installed with pulse valves and control system
3) Block building structure, can be constructed to handle the required airflow
Application:
1) Welding fume, foundry
2) Food, pharmaceutical
3) Shot blasting
4) Tobacco, metal, painting
5) Energy
Technical Parameters:
PARAMETER |
Removing dust air volume |
Filtration(cubic meters) |
Induced draft fan rate(kw) |
HR-4 |
3000 |
80 |
5.5 |
HR-8 |
6000 |
120 |
7.5 |
HR-12 |
9000 |
180 |
11 |
HR-16 |
12000 |
240 |
22 |
HR-24 |
18000 |
360 |
22 |
HR-32 |
24000 |
480 |
30 |
HR-36 |
27000 |
540 |
37 |
HR-40 |
30000 |
600 |
37 |
HR-48 |
38000 |
720 |
37 |
HR-56 |
42000 |
840 |
45 |
HR-64 |
56000 |
860 |
45 |
Qingdao Puhua Heavy Industrial Machinery Co., Ltd. was founded in 2007. We focus on designing, researching and developing, manufacturing and selling shot blasting machine, CNC punching machine, sand preparation equipment, moulding core production equipment, and environmentally-friendly dedusting equipment.
We have more than 60 self-developed designs and molds for you to choose from. We release at least 10 new products monthly to meet the latest market trends. With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers.
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion.
3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.