Product Description
Cleaning Machine Steel Structure Shot Blasting Equipment
Q69 Steel Profiles shot blasting machines are used to remove scale and rust from metal profiles and sheet metal components. It applies to surface rusting and painting art of shipping,car,motorcycle,bridge,machinery,etc.By combining a roller conveyor with the appropriate crossover conveyors, individual process steps such as blasting, conservation, sawing and drilling can be interlinked. This ensures a flexible manufacturing process and high material output.
Product Paramenters
Type |
Q698 |
Q6912 |
Q6915 |
Q6920 |
Q6925 |
Q6930 |
Q6940 |
The effective cleaning width(mm) |
800 |
1200 |
1500 |
2000 |
2500 |
3000 |
4000 |
The room
feed-in size(mm) |
1000*400 |
1400*400 |
1700*400 |
2200*400 |
2700*800 |
3200*800 |
4200*400 |
The length of cleaning workpiece(mm) |
1200-12000 |
1200-1600 |
1200-12000 |
1200-12000 |
3000-12000 |
2400-12000 |
4500-18000 |
The speed of wheel conveyer(m/min) |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
The thicksness of cleaning steelsheet(mm) |
3-60 |
3-60 |
1.5-60 |
3-60 |
3-60 |
3-110 |
4.5-100 |
The section steel specification(mm) |
800*300 |
1000*300 |
1500*300 |
2000*300 |
2500*700 |
3000*700 |
4000*300 |
The quantity of shot blasting(kg/min) |
4*180 |
4*250 |
4*250 |
6*250 |
6*250 |
6*360 |
8*360 |
The first enclosed quantity(kg) |
4000 |
4000 |
4000 |
4500 |
4500 |
8000 |
11000 |
Roll brush adjusting height(mm) |
200 |
200 |
350 |
450 |
600 |
850 |
900 |
Airness capacity(m³/h) |
22000 |
17560 |
19000 |
19500 |
27758 |
28050 |
38000 |
Exterior size(mm) |
25014*4500*9015 |
12180*4250*7095 |
15200*5370*6797 |
30650*6850*9095 |
31200*8078*7500 |
44042*6385*7758 |
45000*7830*11117 |
Total power(except for dust cleaning)(kw) |
90 |
78.3 |
113.5 |
156.6 |
204.8 |
224.55 |
293.6 |
Details Images
Shot Blasting Sample
Application:
1. Remove scale and rust from metal profiles and sheet metal components.
2. Surface treatment for H beam, Steel Plate, sections, angles, pipes and others.
3. Blast cleaning of complex welding constructions where all surfaces are cleaned. For example head- and base-plates, welded ribs and re-enforcements must be de-scaled and de-rusted. And the welding seams must be cleaned.
4. Typical areas of application: Steel and shipbuilding, automobile, motorcycle, bridge, machine.Company Profile
Service
1. Installation and commissioning issue: We will send 1-2 technicians to assist with machine installation and commissioning, customer pays for their tickets, hotel and diet, etc Customer need arrange 3-4 skilled worker and prepare insallation machinery and tools. 2. Warranty time: 12 months from date of commissioning completion, but no more than 18 months from date of delivery. 3. Supply full English documents: including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.
Customer Photos
Product packaging