Customization: | Available |
---|---|
Application: | Forging,Casting,Machinery. Metal |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1,The whole chamber is made of integral thick steel plate bending welding structure, the strength is higher.
2,Double tunable type ,high productivity,achieve 50-60 wheels per hour.
3,Use Vertical pulse filter cartridge, better dust removal effect,replacement cartridge is simple and convenient, with quick replacement fixture.
4,The gate structure is reasonable and the sealing effect is increased,have safety pneumatic plug limit protection.
5,Pneumatic shot blasting machine cover,when open the gate,the abrator will be covered to prevent the projectile.
Item type | Q3512 | QF3512 | Q3525E |
Clean up the room size (mm) | 1350*560 | 1350*860 | 2654*560 |
Clean the workpiece size (mm) | 600*250*250 | 600*250*500 | 600*500*250 |
Rotary trolley load capacity (Kg) | 400 | 400 | 1000 |
The diameter of mm | 1200 | 1200 | 2500 |
blasting capacity (Kg/min) | 200 | 2*120 | 2*250 |
Power (KW) | 11 | 7.5*2 | 15*2 |
Enhance the capacity (T/h) | 15 | 15 | 30 hoist |
The separator (T/h) | 15 | 15 | 30 |
The first loading capacity (Kg) | 400 | 350 | 1500 |
Ventilation (M/h) | 2800 | 2800 | 5200 |
Dimensions (Mm) | 1500*3450*3780 | 1900*1900*4165 | 4260*3647*5366 |
Power (without dust) (KW) | 17.3 | 18.7 | 35.2 |
Qingdao Puhua Heavy Industrial Machinery Co., Ltd. was founded in 2006. We focus on designing, researching and developing, manufacturing and selling shot blasting machine, CNC punching machine, sand preparation equipment, moulding core production equipment, and environmentally-friendly dedusting equipment, etc.
We have more than 60 self-developed designs and molds for your choice. With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers.
Contact Information:
FAQ:
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.