Customization: | Available |
---|---|
Application: | Machinery,Metal,Forging,Casting |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Advantages :
1.Improving corrosion resistance to the metal profile of the machine.
2.Improving anti-fatigue performance and extend steel lifetime.
3.Improving the steel surface processing craft.
4.Improving the surface preparation efficiency, reducing the labor intensity.
5.Alleviating the environment pollution.
Technical Parameters:
Item |
Unit |
Q376 |
Q378c |
Q3710 |
Q3720 |
Q3730 |
Q3750 |
Q37100 |
Maximum weight of cleaning |
Kg |
500 |
800 |
1000 |
2000 |
3000 |
5000 |
10000 |
Abrasive flow rate |
Kg/min |
2*200 |
2*250 |
2*250 |
3*250 |
3*250 |
4*250 |
5*250 |
Ventilation capacity |
m3/h |
5000 |
5000 |
5000 |
9000 |
11000 |
14000 |
16000 |
Elevator lifting amount |
T/H |
24 |
30 |
30 |
45 |
45 |
60 |
75 |
Separating amount |
T/H |
24 |
30 |
30 |
45 |
45 |
60 |
75 |
Max overall dimensions of suspender |
mm |
Ø600 *1200 |
Ø1000 *1600 |
Ø1200 *1800 |
Ø1400 *2200 |
Ø1600 *2300 |
Ø1800 *2500 |
Ø3000 *3000 |
Our technical soluions encounter no limits to load capacity requirements.Contact us and your blasting issues will find an appropriate solution.
Cleaning Effect:
Company Information:
Qingdao Puhua company focus on design, research, develop, manufacture and sell sand blast booth, sand processing equipment, painting line,environmental protection equipment, all kinds of shot blasting machine, , includes hook type, crawler belt type, roller type, catenary type, road surface type etc. Products all adopt auto CAD, supplying the best cost performance products for casting, metallurgy, automobile, shipbuilding, construction, mining machinery and engineering machinery. They also can base on users' requirements to design and manufacture various non-standard special casting machinery, provide the designing - manufacturing - debugging - training - services for the integration of turnkey projects.
FAQ:
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.
Contact Information: