Customization: | Available |
---|---|
Application: | Steel Plate, Steel Strucutre, H Beam |
Fuel: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameter | Q698 | Q6912 | Q6915 | Q6920 | Q6925 | Q6930 | Q6940 |
The effective cleaning width (mm) |
800 |
1200 |
1500 |
2000 |
2500 |
3000 |
4000 |
Dimension of inlet opening (mm) |
1600*800 |
1200*400 |
1700*400 |
2200*400 |
2700*800 |
3200*800 |
4200*400 |
The length of cleaning workpiece (mm) |
1200-12000 |
1200-1600 |
1200-12000 |
1200-12000 |
3000-12000 |
2400-12000 |
4500-18000 |
The speed of conveyor (m/min) |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
0.5-4 |
The thickness of cleaning steel sheet (mm) |
3-60 |
3-60 |
1.5-60 |
3-60 |
3-60 |
3-110 |
4.5-100 |
Shot ball flow rate (kg/min) |
4*120 |
4*250 |
4*250 |
6*250 |
6*250 |
6*360 |
8*360 |
The shot ball first loading (kg) |
4000 |
4000 |
4000 |
4500 |
4500 |
8000 |
11000 |
Roll brush adjusting height (mm) |
200 |
200 |
350 |
450 |
600 |
850 |
900 |
Air capacity (m3/h) |
22000 |
17560 |
19000 |
19550 |
27758 |
28050 |
38000 |
1 |
20 years professional production experience in shot blasting machinery industry. |
2 |
22,000 m^2 production workshop, strong production capacity. |
3 |
Professional senior engineer develop the best solution. |
4 |
Strict quality control system, CE, BV, ISO9001 certificate available. |
5 |
Main components adopt imported international famous brand. |
6 |
Timely delivery, one hour to Qingdao port. |
7 |
Professional after-sale service, Email will be reply in 24 hours. |
8 |
Site installation and commissioning in your factory. |
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full English documents:
Including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.