Customization: | Available |
---|---|
Certification: | CE, ISO |
Installation Method: |
Vertical |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features:
1. It uses full set of computerized design and the design is correct & reliable.
2. The casing uses framework structure with high intensity and good stability, it can be designed according to different pressure and temperature resistant requirements.
3. Gas inlet & outlet type can be designed into various kinds of forms according to technical arrangement and flue gas characteristics, the technical arrangement is flexible and changeable.
4. It uses flow resistance plus flow guidance type gas flow distribution equipment, therefore it has good gas flow evenness without dust blockage.
5. The discharge electrode is properly connected with the frame without wire dropping and breakage.
6. It uses hammer type rapping with lateral arm, the rapping strength transmission is even with good effect, therefore, it is easy to clean the dust.
Technical Parameters:
PARAMETER |
Removing dust air volume |
Filtration(cubic meters) |
Induced draft fan rate(kw) |
HR-4 |
3000 |
80 |
5.5 |
HR-8 |
6000 |
120 |
7.5 |
HR-12 |
9000 |
180 |
11 |
HR-16 |
12000 |
240 |
22 |
HR-24 |
18000 |
360 |
22 |
HR-32 |
24000 |
480 |
30 |
HR-36 |
27000 |
540 |
37 |
HR-40 |
30000 |
600 |
37 |
HR-48 |
38000 |
720 |
37 |
HR-56 |
42000 |
840 |
45 |
HR-64 |
56000 |
860 |
45 |
Qingdao Puhua Heavy Industrial Machinery Co., Ltd. was founded in 2007. We focus on designing, researching and developing, manufacturing and selling shot blasting machine, CNC punching machine, sand preparation equipment, moulding core production equipment, and environmentally-friendly dedusting equipment.
We have more than 60 self-developed designs and molds for you to choose from. We release at least 10 new products monthly to meet the latest market trends. With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers.
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion.
3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.