Customization: | Available |
---|---|
Certification: | Ce ISO BV |
Installation Method: |
Horizontal |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Typical Technical Parameters:
PARAMETER |
Removing dust air volume |
Filtration(m2) |
Induced draft fan rate(kw) |
HR-4 |
3000 |
80 |
5.5 |
HR-8 |
6000 |
120 |
7.5 |
HR-12 |
9000 |
180 |
11 |
HR-16 |
12000 |
240 |
22 |
HR-24 |
18000 |
360 |
22 |
HR-32 |
24000 |
480 |
30 |
HR-36 |
27000 |
540 |
37 |
HR-40 |
30000 |
600 |
37 |
HR-48 |
38000 |
720 |
37 |
HR-56 |
42000 |
840 |
45 |
HR-64 |
56000 |
860 |
45 |
Blasting operations vary as do facility requirements. To find the proper dust collection system for your blasting operation, we encourage you to contact us for better solution.
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.
Contact Information: