Steel Plate Shot Blasting&Painting Production Line
The steel pretreatment line process refers to a process in which the steel is subjected to surface shot blasting and a protective primer before the processing. The steel can be pretreated to improve the corrosion resistance of mechanical products and metal components, improve the fatigue resistance of the steel plate and prolong its service life. At the same time, it can optimize the surface state of the steel plate, which is beneficial to the cutting and precision blanking of CNC cutting machine. In addition, since the shape of the steel before processing is relatively regular, which is conducive to mechanical rust removal and automatic painting, the use of steel pretreatment can greatly improve the efficiency of the cleaning work, reduce the labor intensity of the cleaning work and environmental pollution. Because of this, the steel pretreatment process has been promoted and applied in the developed countries.Many enterprises have already mentioned the steel pretreatment process on the agenda of technological transformation.
The steel pretreatment line consists of a shot blasting machine, an automatic painting room, a drying room, a workpiece conveying system, a shot blasting system and an electrical control system.
This Production line is coordinated and controlled by the advanced programmable controller to complete the following process: roller conveyor → shot blasting → painting → drying → roller conveyor, which constitutes a Steel plate pretreatment production line.
Company Information:
Qingdao Puhua company focus on design, research, develop, manufacture and sell sand blast booth, sand processing equipment, painting line,environmental protection equipment, all kinds of shot blasting machine, , includes hook type, crawler belt type, roller type, catenary type, road surface type etc. Products all adopt auto CAD, supplying the best cost performance products for casting, metallurgy, automobile, shipbuilding, construction, mining machinery and engineering machinery. They also can base on users' requirements to design and manufacture various non-standard special casting machinery, provide the designing - manufacturing - debugging - training - services for the integration of turnkey projects.
More Products:
FAQ:
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.